nereis@ostech.ru
| Index | Diving | Fishing | Nature | Accommodation | Contacts | Price-list | Directions | Diving sites | Info |
ACCOMMODATION
The ship-hotel reconstruction was made in 2002-2003
The complex started to work on 15 of July, 2003.
After the reconstruction the following rooms were reconditioned:
- sauna with shower and toilet (the first (lower) level)
- 11 double living-cabins (2 of them with shower and toilet), 3 toilets with shower cabins (the second (living) level)
- saloon, caboose and promenade deck ( the third level)